Approved artwork
The final artwork revision file with version number, dimensions, stone count, and color reference.
Material availability, stone dye lots, garment changes, and minimum updates can all shift between orders. A planned reorder confirms each of those variables before production is released — not after.
The final artwork revision file with version number, dimensions, stone count, and color reference.
The supplier item code or your own SKU that uniquely identifies the approved construction.
At least one retained bulk sample that reflects the approved quality and appearance standard.
The current supplier instructions for the exact approved transfer construction.
The approved stone size, color code, and material from the stone chart used during sample approval.
The signed-off specification document recording garment, decoration, placement, packing, and tolerance.
Send the original item code or approved artwork revision. If either has changed, the reorder may require a new review.
Stone color, carrier, and material availability can change. Confirm current stock and any batch differences before committing.
Pricing and minimums can change between orders. Obtain the current written quote before releasing the order.
If the garment, stone reference, or construction has changed, a new sample may be required. Confirm this in writing.
Record the reconfirmed specification, pricing, quantity, packing, and dispatch scope in the written order before production begins.
A successful reorder requires the original item code or approved artwork revision, the approved stone selection, current material availability confirmation, and a reconfirmed specification. If the original supplier records are not available or have changed, a new artwork review may be required.
Stone availability, dye lots, batch variations, carrier specifications, garment changes, minimum order updates, and pricing can all change between orders. A reorder should not be treated as an automatic repeat — confirm current availability and specification before releasing.
Retain at least one approved bulk sample, the written specification with item code and revision, the approved artwork file, the stone chart reference, application instructions, and the packing record. These documents and the physical reference allow a consistent reorder review.
Planning depends on the sampling requirement, material sourcing, production schedule, and logistics. Do not base a reorder timeline on a website estimate. Confirm lead time, any required re-sampling, and the updated specification in writing before committing to a delivery date.